by caroe15 | Mar 17, 2025 | Category #1, Uncategorized
The King’s College Chapel Roof project has won the ‘David Mackay award for Engineering and Sustainability’ at the Greater Cambridge Design and Construction Awards last night. The project was also highly commended in the ‘Best Refurbishment over...
by caroe15 | Feb 18, 2025 | Category #1, Uncategorized
Oliver Caroe has been featured in the Church Times assisting with the installation of 184 solar panels to the south slope of the Quire roof at York Minster. The full article can be viewed...
by caroe15 | Aug 20, 2024 | Category #1, Uncategorized
The Fellows and Master of Trinity College, Cambridge, and Caroe Architecture Ltd have been granted Listed Building Consent for works to repair and conserve the Grade I listed Hall. At the heart of the consented scheme is the conservation of historic fabric of the...
by caroe15 | Jan 30, 2024 | Category #1, Uncategorized
The Chapter of York and Caroe Architecture Ltd have been granted planning permission for two major projects within the York Minster Precinct. The first is a Listed Building Consent for Grade I St William’s College. This project is for vital works to bring a...
by caroe15 | Nov 30, 2023 | Category #1, Uncategorized
The renewal of the leadwork and installation of photovoltaic (PV) panels to the roof of King’s College Chapel has featured in a Guardian article. Journalists were invited to view the installation of the panels and speak to College staff about the project. The...