St Marylebone Church, City of Westminster

St Marylebone, exterior.

Changing Lives Project (Project 3)

Client: St Marylebone Parish Church

Listing: Grade I & Conservation Area

Project Value: £6.25 million

Project Funding: National Lottery Heritage Fund, Cultural Recovery Fund, and private fundraising

Dates: Appointed since 2013, site works 2021 to 2022

Services: Conservation Architect, Lead Consultant, Principal Designer, Heritage Consultant and Conservation Management Plan author for the roofs. Ongoing appointment as Inspecting Architect

St Marylebone Parish Church is a highly significant Grade I listed building that lies within the Regents Park Conservation Area in the City of Westminster, London. The building dates from 1814-17 and was designed by Thomas Hardwick. It is especially significant for its commanding presence within the surrounding urban environment. As originally built, the imposing entrance portico signalled the fashionability and burgeoning prosperity of the area. The surrounding urban environment has since responded to its architectural statement, most notably John Nash’s alignment of the principal entrance to Regent’s Park at York Gate with St Marylebone’s north side in 1822.

St Marylebone was altered in 1884 by architect Thomas Harris who extended the building and remodelled the interior, adding a new semi-circular apse at the south end of the nave. A further scheme of interior remodelling took place under Sir Albert Richardson in the mid-twentieth century, which included the conversion of the end of the north aisle into a small chapel. The building was the site of a ground-breaking improvement project in the 1980s, which saw the crypt cleared and a National Health Service doctors’ surgery installed, along with a healing and counselling centre.

More than 30 years on from this, there was the need for another substantial renovation. The masonry, the roof and the Nave ceiling were in particular need of repair work. The building was subsequently added to Historic England’s ‘At Risk Register.’

The project comprised careful works to the interior. The Crypt was thoroughly refurbished along with replacement building services, in order to improve the facilities for the community. Additionally, a new stair and lift were constructed. The Nave ceiling (a delicate hybrid of fibrous plaster and traditional lath) was carefully conserved and stabilised, and then redecorated.

Externally, masonry was cleaned and repaired, and a new roof added. This is of traditional lead and slatework, but incorporates modern Passivhaus principles. The works facilitate passive ventilation of Nave, and the re-sized rainwater disposal system is designed to cope with changing rainfall intensities as a result of climate change.

St Marylebone interior after CAL works, showing conserved, stabilised and redecorated plaster ceiling.

Details of Design and Construction

The Changing Lives project included roof works. The new roof was required to be historical in appearance, yet modern in performance. Although none of the principles employed were unique, their application to a building of the age and significance of St Marylebone is groundbreaking.

The original roof of Welsh slate had suffered damage in the Second World War and had subsequently been replaced with sheet aluminium. This was poorly designed and was showing signs of failing.

There was a desire to reinstate historically appropriate finishes to the roof but, in a challenging aspect of the brief, the team was asked to incorporate thermal improvements into the design.

This included the introduction of insulation, the creation of an airtight roof and the introduction of appropriate ventilation details.

The re-setting of the junction between the roof and the building at the eaves level was a particularly challenging design problem. To accommodate all of the new requirements, the pitch of the roof at the bottom of the slope was designed with a ‘sprocketed’ section, to manage height differences and ensure the roof components could meet satisfactorily. Wood fibre insulation was also used, with carefully detailed membranes for breathability and air-tightness at different levels, tested in a mock-up and revised on-site.

All of this was required to be carried out to the highest standards of materials and workmanship, befitting the Grade I listed status of St. Marylebone. Plastering conservators moved over the ceiling implementing careful and appropriate repairs to the lath and plaster and fibrous work. They were followed by the specialist decorators refinishing the ceiling level and blending the walls. During these works, the roof was protected by a temporary covering, and access was provided to the underside of the ceiling by an innovative scaffolding structure. This was constructed to span between the walls of the church, with no supports disrupting the Nave so that church services and use by the St Maylebone School could continue while the work proceeded overhead.

St Marylebone interior during CAL works, showing innovative scaffolding design.

The comprehensive improvement programme was carried out while the building remained in use and occupied – not just for church services but for the thousands of NHS patients accessing the doctor’s surgery in the Crypt, as the main assembly hall for the adjacent St Marylebone School, by the Counselling Centre and as for community activities. Managing this required highly complex logistical planning. Internally, the Nave was scaffolded by erecting a deck which took the support from the perimeter walls and left a clear floor to allow the Nave to remain in use.

Another aspect of the works was the cleaning and conservation of many of the monuments. These are now all recorded on the St Marylebone website alongside details of their history, including recognition of any contested heritage.

The building is now once more a perfect support to the church’s mission and community activities. It feels open and welcoming, with a well-lit and generous access to the Crypt. This has improved the experience of the NHS Surgery, community rooms and Crypt Hall (a popular venue for events and displays) – each located on this level. Its new roof is true to the rich historical significance of the building and performs to the highest modern standards of energy efficiency and fire safety.

The team were delighted to receive confirmation from Historic England that the building has been removed from the Historic England ‘At Risk’ Register.

New staircase by CAL.

New roof by CAL, in-keeping with the historic context whilst achieving excellent thermal performance.